11-16-10
Dianne, Linwood and Dick worked on the installation of a counter top. This included making the measurements and cutting a hole out of the counter to later install the plumbing and faucet for the sink.
Before that could happen, they had to see who could get furtherest inside the cabinet with any help from anyone else.
Once Dianne had won that contest, they made sure the tops were level so they could install the counter tops and not have any eggs roll on the floor.
One of the houses required a new floor, wall and windows. The team determined a plan of action and started out by removing the windows, so they can be reused, followed by all of the paneling. Joanne was on nail duty and removed the nails from the paneling after they were removed. The paneling will be used to repair the lower portions of the rest of the house.
After the paneling was removed the sub floor was removed and all of the debris was loaded into a dumpster for removal. Next, JT made the precise measurements for the new floor and made plans for the leveling of the existing structure before raising the sections to install new bricks for the house to sit on.
Lastly, the lumber was cut to begin the installation of the new sub floor. The job is going to be dirty and long until it is completed, but it the team is full of determination and high hopes for getting the job completed.
No comments:
Post a Comment